'Unusual condition' seen before Conn. train wreck

'Unusual condition' seen before Conn. train wreck

Posted: Updated:

NEW HAVEN, Conn. (AP) -- The engineer of the commuter train that derailed last week in Connecticut observed an "unusual condition" on the track before the wreck, federal officials said Friday without explaining what the condition was, though they did say repair work was done last month in the area of the crash.

The National Transportation Safety Board said it has not yet determined a cause of the May 17 crash that injured 70 people and disrupted service for days on the railroad used by tens of thousands of commuters north of New York City.

But the NTSB did say that a joint bar, used to hold two sections of rail together, had been cracked and repaired last month and that rail sections in the area of the derailment have been shipped to Washington for further examination.

Metro-North railroad is conducting an inspection and inventory of all the joint bars on its main tracks, NTSB said.

The eastbound train from New York City derailed during evening rush hour in Bridgeport, came to a stop and was struck about 20 seconds later by a westbound train, NTSB said. The westbound engineer applied the emergency brakes before striking the eastbound train, NTSB said.

The eastbound engineer told investigators he saw an unusual condition on the track as he approached the area, NTSB said.

It's not clear what caused the crash but repair work done in the area weeks before it may have weakened the track, George Cahill, an attorney representing seven Metro-North workers injured in the crash, said this week. He also expressed concern that wheels on the new trains were too tight.

NTSB said it has completed the on-scene phase of the investigation and will now analyze the information gathered. Investigators have collected photos, video and other evidence, completed mechanical inspections of the rail cars, the track and signal system, interviewed employees, witnesses and first responders and documented the accident site, NTSB said.

Attorneys for a 65-year-old woman injured in the crash said they have filed a lawsuit alleging negligence by Metro-North.

Attorney Joel Faxon said the suit was filed Friday in federal court in Bridgeport to gain access to witnesses and allow victims and their families to be involved in the investigation. He said it was the first federal lawsuit stemming from crash.

He said his client, Elizabeth Sorensen of Bridgeport, remains in critical condition with a brain injury and multiple bone fractures.

A Metro-North spokeswoman did not immediately respond to a message seeking comment.

AP-WF-05-24-13 1702GMT

  • TrafficMore>>

  • Stuck NJ Transit train removed

    Stuck NJ Transit train removed

    Tuesday, July 29 2014 12:24 PM EDT2014-07-29 16:24:49 GMT
    A New Jersey Transit commuter train with about 1,000 passengers on board became disabled just outside the Hudson River tunnel in Manhattan on Tuesday morning. The train which was on the Northeast Corridor line broke down near 10th Ave., according to NJ Transit officials.  It is not clear what caused the mechanical problem. Lighting and air conditioning on the train were never impacted, according to NJ Transit.
    A New Jersey Transit commuter train with about 1,000 passengers on board became disabled just outside the Hudson River tunnel in Manhattan on Tuesday morning. The train which was on the Northeast Corridor line broke down near 10th Ave., according to NJ Transit officials.  It is not clear what caused the mechanical problem. Lighting and air conditioning on the train were never impacted, according to NJ Transit.
  • Could airlines create a class just for children?

    Could airlines create a class just for children?

    Monday, July 28 2014 12:37 PM EDT2014-07-28 16:37:57 GMT
    Imagine a segregated airline flight: one section for children and one section for adults only. This is the vision of entrepreneur Richard Branson, the president of Virgin Atlantic.
    Imagine a segregated airline flight: one section for children and one section for adults only. This is the vision of entrepreneur Richard Branson, the president of Virgin Atlantic.
  • G subway line shutting down for 5 weeks

    G subway line shutting down for 5 weeks

    Friday, July 25 2014 9:37 PM EDT2014-07-26 01:37:26 GMT
    Beginning Friday night, a portion of the G subway line that connects Brooklyn and Queens will be shut down for five weeks.
    The MTA says there will be no service between the Nassau Avenue station in Greenpoint and Court Square in Long Island City until Sept. 2.
    Beginning Friday night, a portion of the G subway line that connects Brooklyn and Queens will be shut down for five weeks.
    The MTA says there will be no service between the Nassau Avenue station in Greenpoint and Court Square in Long Island City until Sept. 2.
Powered by WorldNow

4739 NW 53rd Avenue, Sutie B
Gainesville, FL 32653

Phone: (352) 371-0051

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | Terms of Service | Ad Choices