Worker slightly injured in JFK Airport terminal demolition

Worker slightly injured in JFK Airport terminal demolition

Posted: Updated:

The Port Authority says a construction worker was slightly injured during demolition of a departures runway at vacant Terminal 3 at John F. Kennedy International Airport Sunday morning.

A spokesman for the PA said the worker was hit in the leg by falling debris at around 10:00 a.m. and that the worker did not appear to be seriously injured. The worker was said to be walking with a slight limp afterward.

The terminal, known as the Worldport, is recognized for its shape that resembles a flying saucer.

Worldport was built more than 50 years ago and the terminal once housed Pan American World Airways. Delta Air Lines began using it in 1991 after Pan American stopped operations, but left the terminal last month.

There are plans that call for the terminal to be used for parking airplanes.

 

The Associated Press contributed to this report

  • TrafficMore>>

  • Could airlines create a class just for children?

    Could airlines create a class just for children?

    Monday, July 28 2014 12:37 PM EDT2014-07-28 16:37:57 GMT
    Imagine a segregated airline flight: one section for children and one section for adults only. This is the vision of entrepreneur Richard Branson, the president of Virgin Atlantic.
    Imagine a segregated airline flight: one section for children and one section for adults only. This is the vision of entrepreneur Richard Branson, the president of Virgin Atlantic.
  • Bridge closed after its rammed by runaway barge

    Bridge closed after its rammed by runaway barge

    A stretch of a major southern New Jersey roadway was closed for several hours after a runaway barge rammed into a bridge.
    A stretch of a major southern New Jersey roadway was closed for several hours after a runaway barge rammed into a bridge.
  • G subway line shutting down for 5 weeks

    G subway line shutting down for 5 weeks

    Friday, July 25 2014 9:37 PM EDT2014-07-26 01:37:26 GMT
    Beginning Friday night, a portion of the G subway line that connects Brooklyn and Queens will be shut down for five weeks.
    The MTA says there will be no service between the Nassau Avenue station in Greenpoint and Court Square in Long Island City until Sept. 2.
    Beginning Friday night, a portion of the G subway line that connects Brooklyn and Queens will be shut down for five weeks.
    The MTA says there will be no service between the Nassau Avenue station in Greenpoint and Court Square in Long Island City until Sept. 2.
Powered by WorldNow

4739 NW 53rd Avenue, Sutie B
Gainesville, FL 32653

Phone: (352) 371-0051

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | Terms of Service | Ad Choices